ABOUT US

Message from Top Management

Since our founding in 1951, our company has been a pioneer in explosion-proof technology for more than half a century, focusing on the design and construction of explosion-proof electricity and instrumentation equipment to general electricity and instrumentation equipment. Our goal is becoming an excellent mid-sized construction company.

Our company has been widely trusted by our customers for more than half a century, which served us to accumulate extensive experience and refine our technology.

The company name, Astec, is taken from the Advanced Systems & Total Engineering Concept, and our policy is to meet the needs of our customers with advanced systems and outstanding technological capabilities. Based on our extensive experience in domestic and overseas plants, we are now quickly responding to global issues such as lack of resources and environmental pollution.

In recent years, we have focused on the development of maintenance services in order to improve our technology, with the aim of continuing to provide reliable services to our customers.

President
Kensuke Horie

What is Astec / Concept

Unique technology that supports the top share in Japan.

As a pioneer of explosion-proof technology, Showa Astec develops from explosion-proof electricity, instrumentation equipment to general electricity, instrumentation equipment construction, and electric heating construction. Thanks to our extensive experience, we provide advanced explosion-proof technology for customers in a wide range of fields in petroleum refining and petrochemical plants. In addition to equipment construction, we constantly keep the latest data through daily maintenance, electrical equipment diagnosis, motor maintenance, and utilization of the electrical equipment database. Therefore, we provide total support for customers from the electrical room to the motor.

Three key points for trusting us

  • 1. Safety, Quality, Delivery Date

    While ensuring the safety and reliability that are the original purposes of construction, we respond to customer requests with our proposal capabilities and unique construction methods.

  • 2. Total Support

    Integrated support from planning to design, construction, and maintenance to meet various requests.

  • 3. Quality Management

    Quality management guaranteed, which is the lifeline for companies that handle explosion-proof technology.

1 Safety / Quality Delivery Date 2 Total Support 3 Quality Management

COMPANY PROFILE

  • Name

    Showa Astec Co., Ltd.

  • Founded in

    1951/2/26

  • Head Office

    Palazzo Astec Bldg. 5F & 6F, 2-8-1,
    Higashi-Shimbashi, Minato-ku, Tokyo, 105-0021

  • Tel

    03-3437-3851 (main)

  • Capital

    100 million yen

  • Business event

    • Explosion-proof electrical and instrumentation engineering for petroleum and petrochemical plants
    • Electrical and instrumentation engineering for general buildings and factories
    • Inspection and maintenance of electrical and instrumentation equipment
    • Air conditioning and interior work
    • Electric heating equipment construction
    • Sales of products such as electrical equipment from single units to systems
  • Officer

    • President Kensuke Horie
    • Managing Director Keishi Deguchi
    • Director Satoru Shimizu
    • Director Takashi Kagawa
    • Director Junya Amada
    • Auditor Masaya Nobuhira
  • Sales Mix

    68% 14% 2% Explosion Proof Electrical and Instrumentation System General Electrical andInstrumentation System General Electrical &Instrumentation SystemDiagnosis and MotorMaintenance 4% Electrical Heating 12% Other

    Overseas Offices

    • Singapore
      Showa Astec Asia Holdings Pte. Ltd.
      Showa Denki (Singapore) Co. Pte. Ltd.
      24 Jurong Port Road #01-02 Singapore 619097
    • Thailand
      Thai Shoden Co., Ltd.
      No. 27/714 (H), Sawadee-Krungthep,
      Soi Onnuch46, Srinakarin Road,
      Nongbon Subdist., Pravej Dist., Bangkok, Thailand 10250
    • Philippines
      ATS Construction International, Inc.
      5th Floor, Yupangco Bldg., 1606 Trade St., cor Investment Drive,
      Madrigal Business Park, Ayala Alabang,
      Muntinlupa City, Philippines 1780
    • Malaysia
      AEIC Construction (Malaysia) Sdn. Bhd.
      Room 1607, Level 16, 1 Sentral Jalan Stesen Sentral 5,
      KL Sentral, Kuala Lumpur, Malaysia 50470
  • ACHIEVEMENTS (2010-2019)

    Netsales 2019 2018 2017 2016 2015 2014 2013 2012 2011 2010 0 -200 200 400 600 800 1,000 1,200 1,400 1,600 1,800 2,000 2,200 2,400 2,600 2,800 3,000 (million yen) Singapore Philippines Malaysia Thailand Asia Holdings Netsales 2019 2018 2017 2016 2015 2014 2013 2012 2011 2010 0 -200 200 400 600 800 1,000 1,200 1,400 1,600 1,800 2,000 2,200 2,400 2,600 2,800 3,000 (million yen) Singapore Philippines Malaysia Thailand Asia Holdings
    • 2011-2013

      Mining PJ

      Philippines

    • 2013-2015

      LNG PJ

      Malaysia

    • 2015-2017

      Solar Power Plant PJ

      Japan

    • 2016-2017

      LNG PJ

      Japan

    • 2016-2018

      Ethylene PJ

      Malaysia

COMPANY HISTORY

1951 Showa Denki Co., Ltd., was established
1979 Showa Denki (Singapore) Co., Pte. Ltd., was established in Singapore
1985 Thai Shoden Co., Ltd., was established in Thailand
1992 Name of the company was changed to Showa Astec Co., Ltd.
1994 ATS Construction International, Inc. was established in Philippines
2012 Current President, Kensuke Horie, was inaugurated
2013

SHOWA ASTEC ASIA HOLDINGS PTE. LTD. was established in Singapore

AEIC CONSTRUCTION (MALAYSIA) SDN. BHD. was established in Malaysia

Advanced to Algeria & Iran Established SDS in Singapore Established TSD in Thailand TheBubble Burst TheLehmanShock 1963 1965 1967 1969 1971 1973 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995 1997 1999 2001 2003 2005 2007 2009 2011 2013 2015 2017 2019 Management by Tatsutoshi Ura Management by Michio Ura Managementby Kensuke Horie Increased in orders ofoverseas project Increased in orders of overseas projectand domestic office building Established ATS in Philippines Established Asia Holdings in Singapore Returned back to Malaysian Market (Established AEIC) TheLehmanShock 1963 1965 1967 1969 1971 1973 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995 1997 1999 2001 2003 2005 2007 2009 2011 2013 2015 2017 2019 Management by Tatsutoshi Ura Management by Michio Ura Management by Kensuke Horie Advanced to Algeria & Iran Established SDS in Singapore Established TSD inThailand Established ATSin Philippines Established Asia Holdings in Singapore Returned back to Malaysian Market (Established AEIC) TheBubble Burst Increased in orders ofoverseas project Increased in orders of overseas project and domestic office building

OUR BUSINESS

ENGINEERING

Detail design work for General & Explosion-Proof Electrical, Instrumentation, Communication System and Heat Tracing construction have been experienced and carried out for the development of oil refinery and petrochemical plants since our establishment in 1951. For the purpose of satisfying our customer's specifications, proposals, such as the most preferable design work, customer's objectives, location, scale, and construction schedule are taken into consideration that could be provided to our customers in accordance with our accumulated know-how.

ADVANTAGE

  • 00

    70

    Accumulated know-how in 70 years by completing projects all over the world.

  • 00

    53

    Nationwide network with 40locations and providing uniformized quality service to customers.

  • 000

    320

    More than 320 skilled engineers are located all over Japan and also putting high priority into education of the next generation staffs.

CONSTRUCTION

In a variety of fields from oil refineries to petrochemical, chemical, factory, building, solar power, and fire power plants, proven and trusted construction for general and explosion-proof electrical instrumentation are offered to keep our customer's construction period while adhering to safety and loss prevention. Services include construction supervision, safety control, quality control, material procurement control, field engineering, testing, and commissioning assistance for our customers, and these services are provided not only overseas but also for domestic projects.

HIGHLIGHT FIGURES at TRAIN9 PROJECT (MALAYSIA)

Man hour million 1.6 1.6 Months Project Full Processes 22 22 Cable Kilometers for 14 Months 850 850 Lights for 8 Months 5382 5382 Workers Max 490 490 NationalitiesOrganization 6 Man hour million 1.6 1.6 Months ProjectFull Processes 22 22 Cable Kilometers for 14 Months 850 850 Lights for 8 Months 5382 5382 Workers Max 490 490 NationalitiesOrganization 6

MAINTENANCE

Explosion-proof electrical instrumentation equipment maintenance

Facility maintenance services also are undertaken in the field of oil refineries and chemical factories, where the contents are inspections for motors, electrical and instrumentation equipment, and electrical and control panels, and have been achieved in order to preserve and continuously conserve our customer's plants. Services include maintenance planning for Turnaround and Shutdown and ensure that the provided maintenance work and shutdown activities are embarked on with safety, quality, and on time. The result of our maintenance work would improve the operational capacity, uptime, and quality of output for our customer's plants.

Maintenance Electric instrumentation equipment inspection / instrument maintenance Turn Around at domestic 40 sites (as of year 2021) Conservation work Modification/extension

Electrical equipment inspection

Our goal is to meet the needs of our customers, and we aim to provide total management of electrical equipment through bulk contracting.

Electrical Equipment Inspection Service

In order to operate a plant safely, it is essential that various electrical facilities and equipment work properly. We carry out periodic and routine maintenance inspections of all electrical equipment, as well as various inspections and maintenance, three-phase uneven insertion tests of circuit breakers, special tests of protective relays, and instrument calibration and testing of switchboards, in order to ensure the normal operation of an electrical room, the heart of a plant.

In addition, we also create protection coordination curves and investigate cable accidents (we even carry out restoration work at the failure point after localization) to link the inspection of electrical equipment to total maintenance.

Electric motor maintenance / diagnostic maintenance

We provide a maintenance system from the diagnosis of remaining service life to maintenance by calculating residual breakdown voltage.

Motor Maintenance

Continuous daily maintenance predicts and prevents sudden motor failures. In addition, we use the accumulated data to propose maintenance that does not result in over-maintenance. In addition, we are ready to respond to sudden breakdowns at any time of the day or night.

Rotating machine insulation diagnosis

Estimated breakdown voltage values (VP%) of rotating motors, such as generators and high-voltage induction motors, are calculated according to the General Criteria Guidelines developed from our own database.

Rotating machine insulation diagnostic car

This machine and the diagnostic vehicle were introduced for the purpose of precision insulation diagnosis of generators and high-voltage induction motors, which are the power source of the plant. In order to meet the needs of customers and in order to prevent sudden breakdowns of these high-voltage motors, we have installed the established residual breakdown voltage calculation system and diagnostic equipment to provide customers with the details of the measurement results in advance, so that we can provide satisfactory diagnostic results.

Electrical Equipment Database

We developed the test data management software using single wire connection diagrams to meet customer needs with trend management in mind.

  • Construction
  • Maintenance
  • 20% 80%
    1990
    Maintenance : JPY 4.7 billion
  • 47% 53%
    2000
    Maintenance : JPY 7.5 billion
  • 15% 85%
    2011
    Maintenance : JPY 13.5 billion
  • 93% 7%
    2019
    Maintenance : JPY 17.2 billion